Old’s first tidal energy farm in Scotland

The launch of the world’s first large-scale tidal energy farm in Scotland has been hailed as a significant moment for the renewable energy sector.

A turbine for the MeyGen tidal stream project in the Pentland Firth was unveiled outside Inverness in the Scottish Highlands.

After the ceremony, attended by Nicola Sturgeon, the turbine, measuring about 15 metres tall (49ft), with blades 16 metres in diameter, and weighing in at almost 200 tonnes, will begin its journey to the project’s site in the waters off the north coast of Scotland between Caithness and Orkney.

The turbine will be the first of four to be installed underwater, each with a capacity of 1.5 megawatts (MW), in the initial phase of the project.

R3800ead more here:

Advertisements

Leave a comment

Filed under Uncategorized

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s